homeabout the firmservicesproject listftpcontact us

5 West Postpartum Floor Renovation
Project Data

Client:  Morton Plant Mease Healthcare
Architect:  Studio S Architecture, LLC
Mechanical Engineer:  EPI
Electrical Engineer:  KBA
General Contractor:  The Terbo Group, Inc.

Because of the demand on the Mother/Baby patient population, eight additional rooms were added adjacent to the existing Labor and Delivery and Recovery Rooms on the 5th floor of the Countryside campus.  A soft color palette was utilized to create a soothing environment for the families.  

Although all systems tie back to the main nurse's station on the 5th floor, the unit is designed to act as a stand-alone postpartum unit with all of its own supporting spaces available directly from the unit.


Studio S Architecture, LLC
AA26002135


813.205.2396 Michael Smith
813.298.5545 Jodi Solito

Mailing Address:
111 W. Curtis Street
Tampa, FL  33603